Walvisbaai (4)
Looking North:
Looking South:
Sea level getting flooring:
Track planning in progress:
Mainline through to staging all in:
Sub-roadbed for the yard:
2012: North Side
South side
Engine facility:
Active turnouts and ballasting creeping in!
Now we actually switch the North end of the yard!
And powered...
Switch lead, track on the right...
2019, all tracks in...